METKA EGN signs contract with Eni in Tunisia
- Written by E.Tsiliopoulos
METKA EGN, a subsidiary of Mytilineos SA, announced the signing of a contract with Eni Tunisia B.V for the supply and construction (EPC) of an innovative, hybrid system of electric power production in the ADAM oil installation in the Tataouine region in Tunisia.
The project, one of the first of its kind globally, will operate off-grid and will include the installation of a 5 MW solar power and a battery system for energy storage, operating in combination with existing windpower turbines in the region. The produced energy of this hybrid system will be consumed locally in Eni's oil installation facility with the aim to significantly reduce consumption of natural gas in production and to cut CO2 emissions by 6,500 tons/annually.
It is the first cooperation between METKA EGN with Eni. The project will be completed in eight months, while METKA EGN will offer operation and maintenance services for two years.
Related items
-
The entire Spanish royal family bid farewell to Princess Irene in Madrid - They will travel to Athens for the final "farewell"
-
D. Papastergiou: "Greece is moving from planning to action - We are taking advantage of the opportunities of space"
-
Trump wants $1 billion from each country to join the Peace Council
-
Sakkari achieved the point of the year at the Australian Open
-
Frigate Kimon: Naval Cadets welcomed her shouting "long live the Navy"
Latest from E.Tsiliopoulos
- The entire Spanish royal family bid farewell to Princess Irene in Madrid - They will travel to Athens for the final "farewell"
- D. Papastergiou: "Greece is moving from planning to action - We are taking advantage of the opportunities of space"
- Trump wants $1 billion from each country to join the Peace Council
- Sakkari achieved the point of the year at the Australian Open
- Frigate Kimon: Naval Cadets welcomed her shouting "long live the Navy"
